First Labyrinth Work Day – Saturday September 24, 9:00 AM to 6:00 PM

img_0655 The goal for this work phase will be to install the defining lines of the labyrinth circuits. The lines will be brick on a mortar base. The pattern will have been drawn on the ground before the work day begins. Additionally, the main garden spaces need to be defined and the pathways cleared.

1. Brick and Mortar installation:
• moving bricks from pallets to brick layers
• mixing and moving mortar where needed
• laying the brick and mortar (B&M)
• cleanup

If you are skilled at brick and mortar installation you will be a big help!

Tools that will be of use:
• trowels
• joint tools
• levels (12”, 18”, 24”, 48”),
• laser level
• hammer and chisel
• cutting tools
• rubber gloves for mortar work
• additional cement mixer.

Cement Mixer:
We intend to rent one from Home Depot. If someone can pick this up early on the morning of the 24th it will speed things along. A pick up truck may be necessary. We can coordinate the paper work before pickup so you wouldn’t have to bother with that.

2. Garden Space Development:
(less heavy but still demanding job)
• clearing the garden paths of mulch and distributing the mulch to garden beds
• cleaning up and disposing of unwanted debris
• weeding

Tools that will be of use:
• shovels both round spade and flat
• garden rakes
• large buckets
• mattock
• wheelbarrows
• pick up truck for hauling materials to dumpster or woods

Food and drink:
It would be wonderful to have cold drinks and lunch and snack food available to the workers. A portable shade structure would also be handy to cover refreshments and provide a place to retreat from the weather, if necessary. We will have a couple of tables and some chairs.

General Things:
• Friends and family welcome to help.
• Please let Mike Fabian know if you’re coming and talk with him about a possible job for you.
• Please park in the church parking lot.
• Please label any personal items, especially tools. It’s easy to lose them.
• For your own comfort don’t forget gloves, hats, bug spray, sun block.

If you would like to coordinate or contribute to this effort, please let Mike Fabian know.img_0654